Instant Dry Storage for Tarmac & Kier

Tarmac and Kier’s Highways division have been awarded an exciting new maintenance and improvements contract with the London Borough of Barnet, under the Tarmac Kier Joint Venture.

Due to the size of this contract, a new depot has been set up in Wraysbury, just off the M25.

As part of the maintenance contract, Tarmac Kier JV are required to plough and grit the road network, so the dry storage of salt and grit became an issue. This was quickly resolved when they got in touch with our team of Sheltologists.

Zappshelter “Skyler” is a 17-metre wide x 24-metre long Zappshelter, mounted on interlocking concrete blocks, providing over 4400 square feet of dry storage space. This saves a huge amount of time and money, (as damp salt easily gets caught in machinery and gritting lorries).